• fr
  • Epicuria Architectes
    Montgeron (91)

    Rosa Parks high school

    Pilot high school in the 1950s, the Montgeron high school is part of a site with a high quality plant and architectural heritage. The objectives of this restructuring and extension were to enhance this heritage while adding functionality to buildings.

    First mixed pilot high school in France in the 1950s, the establishment occupies a plot of 29 hectares located in an urban environment. The site is distinguished by an exceptional architectural and vegetal heritage, which the proposal preserves and reveals. Frequent due to the extent of the area, the movements of users, complicated by the original superposition of pedestrian and automobile networks, have regained their primacy thanks to the release of a pedestrian axis that unifies the complex. At the heart of the islet, three existing buildings are connected by a new one, with discrete horizontality, imagined as «a gateway». Sparing a front built along the promenade, distinctly identified by a forecourt, this ensemble constitutes the core of the school’s life, around which is functionally articulated the dozen buildings distributed in the park.

    Read more Read less
    Operation
    2010 – Extension and restructuring of a high school with 2,200 students
    Surface
    27 120 m2
    Budget
    42 M€HT
    Achievement
    Livré en 2010
    Project management
    Regional Council of Ile-de-France / Essonne Aménagement
    Architects
    Epicuria Architectes, associated architect / AAM, lead architect
    Consultant
    GAUDRIOT VDE / EGC
    Company
    In separate parts
    Environmental profile
    HQE approach without certification objective
    Load more photos

    Similar projects

    Polyvalent High School
    Mamoudzou à Mayotte

    More info

    Nicolas-Joseph Cugnot High School
    Neuilly-sur-Marne (93)

    More info

    Array ( [0] => 66 )